Construction Process

Effective Construction Process

Building a home or commercial property is one of the most important investments in life. At Arrugam Constructions in Coimbatore , we understand the trust our clients place in us when they choose us to build their dream projects. As a trusted construction company in Coimbatore, our goal is to deliver strong, safe, and beautifully designed buildings while ensuring a smooth and transparent construction process.

Our Arrugam Construction Process is carefully planned to maintain quality, safety, efficiency, and timely delivery. From the first consultation to final handover, every stage is handled by experienced professionals including architects, engineers, project managers, and skilled construction workers.

At Arrugam Constructions in Coimbatore we follows a systematic and professional approach that ensures every project meets high standards of quality and durability.

Constructions Specifications By Arrugam Constructions

01

Foundation

  • Service List TeEarth work excavation up to 5’ in ordinary soil condition for framed.
  • Basement will be raised up to 2’6” height from the existing Ground level.
foundation
pcc
02

PCC

  • PCC is done with 40mm aggregate in 1:4:8 mix ratio for 3” tk including consolidation and damping.
03

Brick work

  • Brick work with cement mortar in 1:6 mix ratio using chamber RED bricks for 9”tk main walls and 4.5”tk partition walls for a height of 10’0” (including racking of joints, pointing, scaffolding, curring etc..,)
brick work
lintel
04

Lintel

  • Continuous Lintel will be constructed along the entire wall for 6”tk.
05

RCC

  • All the structural elements like slab, beam, column, footing, lintel, plinth beam are constructed based on the structural designs.
  • Grade of concrete, size of structural elements and number of rods are provided as per the structural designs.
rcc
loft
06

Loft

  • One Bedroom shall be provided with loft at one side.
07

Doors, windows and ventilators

  • Main door and its frame are laid with teak wood and it will be finished will polish.
  • Inner door frames are laid with sal wood they are finished with one cote wood putty, one cote primer and two cote paints and shutters are ready made.
  • Windows and Ventilators are laid with UPVC materials.
  • If, choose wooden widow option Sal Wooden Window with Frame.
  • Toilet doors are laid with PVC materials.
doors & windows
plastering
08

Plastering

  • Inner and outer walls are plastered with 1:6 mix ratio for 12mm tk finished roughly with sponge.
  • Ceiling will be plastered with 1:4 mix ratio for 12mm tk finished roughly with sponge. (using P.Sand for 12mm tk including hogging, scaffolding works, curing etc ..,)
09

Parapet

  • Parapet wall will be constructed up to 3’0” height and 9”tk.
Parapet
flooring
10

Flooring (BRAND:SOMANY,AGL,KAG)

  • All rooms are finished with vitrified tiles costs Rs.60/- per sq.ft.
  • Skirting along the wall for 3” or 4”ht(client choice). using vitrified tiles in including pointing etc..,
11

Wall & Bathroom Tiles

  • Kitchen wall tiles are provided above kitchen top up to roof level.
  • Kitchen top and main entrance steps are finished with 20mm tk granite
  • Inner and outer bath rooms are finished with tiles up to full height
  • All wall tiles are laid up to roof height.
wall titles
stair case
12

Stair case

  • Inner stair case will be finished with granite and hand rails are provided with stainless steel (304 grade)
  • Outer stair case will be finished with cement mortar and hand rails are provided with mild steel.
11

Wall & Bathroom Tiles

  • Kitchen wall tiles are provided above kitchen top up to roof level.
  • Kitchen top and main entrance steps are finished with 20mm tk granite
  • Inner and outer bath rooms are finished with tiles up to full height
  • All wall tiles are laid up to roof height.
wall titles
painting works
13

Painting works (BRAND - ASIAN,DULEX,BERGER)

  • Inner walls and ceiling are finished with two coats of putty and one coat primer and two coats of Emulsion.
  • Outer walls are finished with one coat white Wash, one coat primer and two coats Emulsion.
  • Only two different colours will be used inside.
14

Electrical and plumbing

  • Per room 3 points are provided by concealed system with (WIRES: POLYCAB OR RR) cables.
  • LEGRAND or equivalent quality switches are used.
  • UPVC pipes are used for bath room inners and PVC pipes are used in outer.
plumbing
sump
15

Sump and overhead tank

  • All Sanitary fittings are provided in Parryware or similar Product basic model.
  • Sump and Septic tank will be provided with 6000 litres capacity.
  • Overhead tank will be provided 2nos of PVC tanks of 1000 litres capacity.(KAVERY BRAND)
16

Weathering course

  • Providing weathering course by Ellies pattern with proper slope over FF. flat roof slab top,top finished with cement.(flooring in including ramming, pointing, curing etc..,)
weathering
compound wall
17

Compound wall

  • 4” hollow block will be used for 6’ height from ground level and elevation side will be plastered.
  • Gate will be provided for up to 100 Kgs.
  • Outer steps will be steel stair case of 150 Kgs.

Above rate includes

Above rate excludes

Materials Choosen By Arrugam Constructions

Client Side Arrangements